A study of carbon cost pass-through rate differences in the power generation industry
1 State Grid Sichuan Economic Research Institute, Chengdu, Sichuan, China
2 Guiyang Power Supply Bureau, Guizhou Power Grid Co., Ltd., Guiyang, GuiZhou, China
* Corresponding author: 2437831572@qq.com
In the context of the operation of China’s carbon emissions trading market, carbon cost pass-through will profoundly impact the country’s power generation industry. However, the core of studying carbon cost pass-through in the power generation industry is determining the carbon cost pass-through rate (CCPTR). Based on this, this paper first takes the Cournot model as the basic principle, which analyzes the impact of different power generation enterprises’ numbers and the characteristics of electricity market demand on the carbon pass-through results. Secondly, based on the Cournot model, this paper further CCPTR under marginal cost variability. The research results show that when the demand function is linear, the larger the CCPTR, the larger the proportion of carbon cost pass-through. When the demand function is isoelastic, the smaller the CCPTR, the smaller the proportion of carbon cost pass-through.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.