Experience in implementing the algorithm for emergency control system of unloading in case of overload in terms of power based on synchrophasor angle
1 «System Operator of the United Power System», Joint-stock Company, Moscow, Russia
2 «Prosoft-Systems», Yekaterinburg, Russia
* Corresponding author: Govorun-MN@so-ups.ru
An algorithm for automatic unloading during a power overload is described. It is based on measurement of the phase angle between voltages on the Tyumen - Ural power transmission line, which is determined by information from phasor measurement units. The algorithm is implemented in a specialized controller K-100.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.