Issue |
E3S Web Conf.
Volume 604, 2025
The 4th International Conference on Disaster Management (The 4th ICDM 2024)
|
|
---|---|---|
Article Number | 12004 | |
Number of page(s) | 7 | |
Section | Multi Hazard Risk Assessment and Management | |
DOI | https://doi.org/10.1051/e3sconf/202560412004 | |
Published online | 16 January 2025 |
Reducing workplace accidents in a cement company by assessment of physical and mental workload: A case study
1 Regional Research and Development Agency of West Sumatra, Padang, West Sumatra, Indonesia
2 Industrial Engineering Department, Faculty of Engineering, Universitas Andalas, Padang, West Sumatra, Indonesia
* Corresponding author: primafithri@eng.unand.ac.id
As one of the leading cement companies in Indonesia, PT Semen Padang is known for its extensive distribution network. As the largest cement factory, the employees at this company engage in work that requires a high level of physical and mental effort. Although the tasks performed by the employees may be similar, the experience of psychological workload can vary greatly among them. The TPM (Total Productive Maintenance) and AFR (Alternative Fuel and Raw Material) departments in the company have several routine activities carried out daily. The numerous job demands that require physical exertion within limited time constraints can lead to a high workload level for employees in TPM and AFR. This workload is not limited to physical aspects but also includes psychological impacts that can disrupt employees’s concentration and performance. In this study, questionnaires were given to 7 employees from TPM and 7 employees from AFR. Based on the research conducted on physical workload using the CVL method, AFR employees experienced more physical workload compared to TPM employees. In terms of mental workload, using the NASA-TLX method, both TPM and AFR employees had 2 employees each with very high mental workload.
© The Authors, published by EDP Sciences, 2025
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.