Photovoltaic Potential of Elevated Metro Stations: A Case Study of Shanghai, China
Shanghai research institute of building sciences Co., LTD, Shanghai, China
* Corresponding author: zhanglina1@sribs.com
As an essential part of urban development, the urban rail transit sector has seen rapid growth in recent years. In alignment with energy-saving and carbon reduction goals, improving energy efficiency in this sector is critical. Elevated metro stations, situated above urban roads with minimal obstructions, present an ideal opportunity for photovoltaic integration. This study investigates the PV potential of Shanghai’s elevated stations through field investigation, numerical simulations and case studies. Taking Shanghai Rail Transit Line 17 as an case study, the photovoltaic application potential of the roof and facade of the elevated station is estimated, the results indicate an annual PV generation of 3.6 million kWh, potentially meeting over 30% of the stations' energy demand.
© The Authors, published by EDP Sciences, 2025
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.