Methodology for linking business processes undertaken during bridge load testing with the specification of required information according to OpenBIM standardsTomasz Owerko and Piotr OwerkoE3S Web Conf., 45 (2018) 00061DOI: https://doi.org/10.1051/e3sconf/20184500061