Geodynamic rock condition, mine workings stabilization during pillar recovery at the level +320 m of the Yukspor deposit of the Khibiny MassifSvetlana Zhukova, Pavel Korchak, Anatoly Streshnev and Igor SalnikovE3S Web Conf., 56 (2018) 02022DOI: https://doi.org/10.1051/e3sconf/20185602022