Feasibility study on the use of oil-well tubing in construction of intermediate support for 6-10 kV high voltage overhead power lines in the development of oilfieldsA.N. Korkishko, O.A. Korkishko and A.A. KosovE3S Web Conf., 124 (2019) 05042DOI: https://doi.org/10.1051/e3sconf/201912405042