An Analytical Continuous Upper Bound Limit Analysis of Pore Water Effect on the Tail Stability of Underwater Shield Tunnels during ConstructionWenjie Song and Yanyong XiangE3S Web Conf., 143 (2020) 01015DOI: https://doi.org/10.1051/e3sconf/202014301015