Numerical methodology for determining the soil mass surface slump, caused by the tunnel construction with the geodetic monitoring results comparisonSergei Kositsyn and Vladimir AkulichE3S Web Conf., 281 (2021) 01042DOI: https://doi.org/10.1051/e3sconf/202128101042