Download citation

Identifying time wastage of prefabricated building hoisting operations based on the MODAPTS and field measurement method: A case study in Nanjing, China

E3S Web Conf., 546 (2024) 02009
DOI: https://doi.org/10.1051/e3sconf/202454602009