Download citation

Optimizing heavy equipment combination in excavation work of a dam channel construction to support SDG 9: A case study in the Jragung Dam Project

E3S Web Conf., 568 (2024) 02004
DOI: https://doi.org/10.1051/e3sconf/202456802004