Pilot installation for thermal utilization of meat-and-bone meal using the rotary kiln pyrolyzer and the fluidised bed boiler
E3S Web Conf., 137 (2019) 01013
Published online: 16 December 2019
DOI: 10.1051/e3sconf/201913701013