An Analytical Continuous Upper Bound Limit Analysis of Pore Water Effect on the Tail Stability of Underwater Shield Tunnels during Construction
E3S Web Conf., 143 (2020) 01015
Published online: 24 January 2020
DOI: 10.1051/e3sconf/202014301015