Study on Pre Pumping and Outburst Elimination Technology of “one hole and two elimination” in Bedding Directional Long Drilling
E3S Web Conf., 329 (2021) 01089
Published online: 09 December 2021
DOI: 10.1051/e3sconf/202132901089