The combination of a NEH heuristic and an LP metric to solve a flow-shop scheduling problem taking into account energy consumption and production costs: a case study
E3S Web Conf., 336 (2022) 00028
Published online: 17 January 2022
DOI: 10.1051/e3sconf/202233600028