Identifying time wastage of prefabricated building hoisting operations based on the MODAPTS and field measurement method: A case study in Nanjing, China
E3S Web Conf., 546 (2024) 02009
Published online: 09 July 2024
DOI: 10.1051/e3sconf/202454602009