Issue |
E3S Web Conf.
Volume 41, 2018
IIIrd International Innovative Mining Symposium
|
|
---|---|---|
Article Number | 01016 | |
Number of page(s) | 7 | |
Section | Environment Saving Mining Technologies | |
DOI | https://doi.org/10.1051/e3sconf/20184101016 | |
Published online | 26 June 2018 |
Study of the Dynamic Loading Impact on the Design of Pentices when Sinking Vertical Mine Shafts
T.F. Gorbachev Kuzbass State Technical University,
650000,
28 street Vesennyaya,
Kemerovo,
Russian Federation
Based on the reconstruction project for Gorno-Shorsky branch of JSC “Evrazruda” developed by JSC “Giproruda” to maintain the enterprise’s production capacity of 6 million tons per year, the shaft “Skipovoy” should be sunk from the level of 115 m to the level of 85 m. Due to the fact that the reconstruction period was to be shortened, the employees of LLC “SibGorComplex Engineering” together with the Underground and Mine Construction Department of T.F. Gorbachev Kuzbass State Technical University developed several variants of new design of wedge pentices for vertical mine shaft sinking under hoisting operations. The results of studies of the dynamic loading impact on the design of safety devices in skip shaft sinking are presented in the article. Based on the method of designing the force action essentials for the emergency skip dumping, the functions allowing determining the value of the impact on the main structural elements of pentices completely bridging over the shaft cross-section that can be used to substantiate the design parameters of new wedge pentices.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.