Technoeconomic analysis of shale gas gross split contract in Naintupo Formation, Tarakan Basin
Department of Chemical Engineering, Faculty of Engineering Universitas Indonesia, Kampus Baru UI, Depok 16424, Indonesia
* Coresponding author: wike_tm07@yahoo.com
The deficit of natural gas supply and demand could be minimized by discovering new reserves in conventional or unconventional reservoir. Shale gas potential in Indonesia was estimated 574 TCF and Naintupo Formation in Tarakan Basin had 5 TCF of technically recoverable reserve with 35 TCF risked gas-in-place. This study would discuss technoeconomic aspect of shale gas field development in Naintupo Formation, Tarakan Basin using gross split contract scheme. Three flow profiles would be developed by using Arps hyperbolic decline curves, consist of low flow profile with initial production (qi) of 150 mmcf/mo, medium (qi = 250 mmcf/mo) and high flow profile (qi = 350 mmcf/mo). Costs estimation were based on benchmarking cost of developed shale gas field in United States and nearby oil/gas field development in Tarakan Basin. Economic analysis showed that medium and high flow profile gave positive economic indicator marked by positive NPV and IRR>10%. Sensitivity analysis showed that flow profile gave more effect in NPV and IRR increased than the gas price. In order to develop positive NPV with discount rate of 10%, it is required to sell shale gas at $6.52/MMBTU in high flow profile or $8.42/MMBTU in medium flow profile.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.