Issue |
E3S Web Conf.
Volume 118, 2019
2019 4th International Conference on Advances in Energy and Environment Research (ICAEER 2019)
|
|
---|---|---|
Article Number | 01039 | |
Number of page(s) | 5 | |
Section | Energy Engineering, Materials and Technology | |
DOI | https://doi.org/10.1051/e3sconf/201911801039 | |
Published online | 04 October 2019 |
AHP- fuzzy comprehensive evaluation of the safety risk in power investment project along “the Belt and Road”
School of Economics & Management, Shanghai University of Electric Power, 200090, Shanghai, China
* Corresponding author: lizhixiang6344@163.com
Energy is the focal point of “the belt and Road” investment cooperation. Because of the uncertainty factors, the safety risk of investment and construction is high, so the management and control of project is very difficult. Taking the 50M wind farm project in a South Asian country as an example, this paper constructs a safety risk assessment index system including 14 basic factors through the identification of the safety factors of “the belt and road” power investment project, and analyzes it by using the AHPfuzzy comprehensive evaluation method. The results show that the final safety risk evaluation score of a power investment project in a South Asian country belongs to the “medium risk” range. Geopolitical risk, national sovereignty risk, local legal risk and local natural environment risk are the main indicators, whose risk grade is relatively high. Finally, the paper puts forward the effective risk countermeasures and suggestions.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.