Issue |
E3S Web Conf.
Volume 143, 2020
2nd International Symposium on Architecture Research Frontiers and Ecological Environment (ARFEE 2019)
|
|
---|---|---|
Article Number | 02009 | |
Number of page(s) | 4 | |
Section | Environmental Science and Energy Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202014302009 | |
Published online | 24 January 2020 |
Public Safety Risk Assessment of Power Investment Project Based on Fuzzy Set and DS Evidence Theory
School of Economics and Management,Shanghai University of Electric Power, 200082, Shanghai, China
* Corresponding author. E-mail :yangth@shiep.edu.cn (Taihua Yang)
In recent years, the international situation has become more and more complex, and the regional conflicts have been escalating, and the risks of overseas public security have been increasing. Based on the four types of public security events, a public safety risk assessment index system of "one belt and one road" electric power investment project is established. Combining the Bayesian network model, and using fuzzy set and DS evidence theory, the public security risk level of the “Belt and Road” countries can be this method has been effectively verified and put forward countermeasures by an example.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.