Issue |
E3S Web Conf.
Volume 134, 2019
The First Interregional Conference “Sustainable Development of Eurasian Mining Regions (SDEMR-2019)”
|
|
---|---|---|
Article Number | 01022 | |
Number of page(s) | 9 | |
Section | Development of Geotechnology | |
DOI | https://doi.org/10.1051/e3sconf/201913401022 | |
Published online | 28 November 2019 |
Allocation of the geo-dynamically hazardous zones during intensive mining of flat-lying coal seams in the mines of SUEK-Kuzbass JSC
1
SUEK-Kuzbass JSC, 652507, Kemerovo region, Leninsk-Kuznetsk, Vasilyev str., 1
2
Saint-Petersburg Mining University, 199106, Saint-Petersburg, Line 21 st, V.I., building 2
Hazardous and ineffective mines were closed, and a number of underground and strip mines of a modern technological level were built as a result of the restructuring of the coal industry in Russia. However, safety in the coal mines continues to be one of the urgent issues nowadays. In underground coal mining, the main types of risks are processes occurring in the rock mass as a result of mining operations. It is necessary to realize timeous and the most accurate prediction of harmful events, which occur during a development of coal fields, to increase the efficiency and reduce the cost of coal mining. The most optimal and, at the same time, comprehensive approach to predicting possible natural hazardous events in the process of modern coal mining are considered in this article. The results of implementation of integration of different methods of geodynamic and geomechanics researches are presented in this paper.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.