Issue |
E3S Web Conf.
Volume 135, 2019
Innovative Technologies in Environmental Science and Education (ITESE-2019)
|
|
---|---|---|
Article Number | 04068 | |
Number of page(s) | 8 | |
Section | Environmental Planning and Environmental Education | |
DOI | https://doi.org/10.1051/e3sconf/201913504068 | |
Published online | 04 December 2019 |
Application of knowledge management on project management in construction
Moscow State University of Civil Engineering, 129337, 26, Yaroslavskoye Shosse, Moscow, Russia
* Corresponding author: a.fedosina@mail.ru
The modern Russian labor market dictates new requirements for the qualifications of project management managers in the investment and construction sector. The leading job and staff search site, HeadHunter, requires to have a Project Management Institute certificate in every third qualification condition. Foreign standards are actively supplanting “domestic rules of the game”. The relevance of this study is contained in the answer to the question: is the body of knowledge on project management applicable to the modern construction industry or is it just “a fashion trend” of senior management who wants to have the “Project Management Professional” certificate that is in demand abroad? This paper contains an analysis of significant and “linear” investment and construction projects for the Russian Federation on the structural assessment of key indicators: time, content, and money. This triad of constraints is reflected in the project management body of knowledge as being most susceptible to change during the project life cycle. The main idea of the analysis is to look at and evaluate the deviation of the values contained in the design and estimation documentation at the “input”, i.e. at the pre-investment stage, and at the “output”, i.e. at the stage of putting the object into operation.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.