Risk analysis of construction diversion scheme
1 Zhejiang Guangchuan Engineering Consulting Co., Ltd, Zhejiang Institute of Hydraulics & Estuary, Hangzhou, Zhejiang, 310020, China
2 Delivery Center, Zhejiang Windey Co., Ltd, Hangzhou, Zhejiang, 311106, China
* Yang Qingqing’s e-mail: hbyangqingqing@qq.com
The determination of diversion risk in the construction of water conservancy and hydropower projects is a key problem related to the guarantee of project safety, saving project investment, giving full play to benefits in advance and facilitating construction. According to the design data, considering the influence of the uncertain factors such as hydrology and hydraulics, this paper analyses the relationship between the elevation of the upstream cofferdam and the upstream design water level, uses the Monte Carlo method to simulate the construction flood process and the discharge capacity of the diversion buildings, makes statistical analysis and determines the risk corresponding to the upstream water level distribution of the cofferdam and the water retaining height of the cofferdam, and establishes the calculation model of the construction diversion risk.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.