Limitations on seismic effects of technological explosions in the combined development of the Sarbai deposit
Institute of mining of the Ural branch of the Russian Academy of Sciences, 620075, 58, Mamina-Sibiryaka st., Ekaterinburg, Russia
* Corresponding author: slavik1988@mail.ru
The issue of joint production of drilling-and-blasting operations (DBO) is acute in the combined field workings with the condition of underground mining in the edge massif of the pit walls. Normally, the underground mine construction begins with the quarry depth approaching the end marks. In this situation, even if there is any volume for wall cutback, it is very insignificant and blasting works come closely to the limit circuit of the quarry, behind which the protected massif is located and underground workings is supposed to be carried out in the future. The main task in carrying out DBO under such conditions is to maintain the stability of this massif. Timely explosion shielding and the creation of contour fracture surfaces by applying controlled blasting reduce the negative explosion impact on the edge, yet do not always prevent the stress waves spread across the massif caused by seismic effect. Therefore, limiting the explosion seismic action in the border zone is as important for the massif stability as the professional pre-splitting.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.