Issue |
E3S Web Conf.
Volume 178, 2020
High Speed Turbomachines and Electrical Drives Conference 2020 (HSTED-2020)
|
|
---|---|---|
Article Number | 01038 | |
Number of page(s) | 4 | |
DOI | https://doi.org/10.1051/e3sconf/202017801038 | |
Published online | 09 July 2020 |
Supply of additional working fluid to the flow part of the NK-8 gas turbine engine
1
Kazan State Power Engineering University, 420034, Krasnoselskaya St., 51, Kazan, Russian Federation;
2
JSC “Tatenergo” branch “Kazan CHP-2”, 420036, Tatsevskaya St., 11, Kazan, Russian Federation
* Corresponding author: dylankn@ya.ru
Modern energy development strategies of advanced countries are based on the construction of gas turbine units which is associated with sufficiently high values of thermal efficiency and a relatively short term for putting them into operation. In this paper, the NK-8 engine is considered. It is modernized with a mixing chamber and a power turbine for the purpose of its ground application. A study was conducted of the injection of an additional working fluid into the flow part of a dual-circuit gas turbine engine. Steam is used as an injectable substance. For research a mathematical model was created in the AS «GRET» software package. The studies were carried out under constant load, the maximum load during injection was determined. An additional worker can be supplied with summer power limitations when it is necessary to increase the power of a gas turbine installation. Studies have shown that the maximum power that can be obtained by supplying steam to the flow part is 32.2 MW.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.