Issue |
E3S Web Conf.
Volume 179, 2020
2020 International Conference on Environment and Water Resources Engineering (EWRE 2020)
|
|
---|---|---|
Article Number | 02023 | |
Number of page(s) | 9 | |
Section | Environmental and Industrial Design | |
DOI | https://doi.org/10.1051/e3sconf/202017902023 | |
Published online | 23 July 2020 |
Implementation of Smart Manufacturing Maturity Assessment Framework:A Socio-Technical Perspective
1 Instrumentation Technology and Economy Institute (ITEI), Beijing 100055, China
2 Shenyang Institute of Automation, Chinese Academy of Sciences, Shenyang 110016, China
3 Faculty of Information and Control Engineering, Shenyang Jianzhu University, Shenyang 110016, China
* Corresponding author’s e-mail: yuelein@126.com
Smart manufacturing capability maturity assessment has been widely carried out in order to help enterprises to identify the direction and route of smart transformation by stationing in enterprises. However, many maturity models for industrial enterprises can not reflect their industrial realities more accurately. Therefore, the aim of this paper attempts to make the smart manufacturing maturity assessment operational, and implement a specific assessment framework based on an existing general conceptual framework. This implementation involved two top-down approaches that one is socio-technical system as a top-level design of factors, and the other is refining assessment domains based on lifecycle and activity models. Results of this implementation showed a two-dimensional assessment framework instance and collections of definitions for capability maturity levels. To conclude, this implementation may be a reference for work specification of smart manufacturing maturity assessment. Three possible future research in the area was suggested at last.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.