Issue |
E3S Web Conf.
Volume 184, 2020
2nd International Conference on Design and Manufacturing Aspects for Sustainable Energy (ICMED 2020)
|
|
---|---|---|
Article Number | 01098 | |
Number of page(s) | 4 | |
DOI | https://doi.org/10.1051/e3sconf/202018401098 | |
Published online | 19 August 2020 |
Investigation on Workability Of M20 Grade Concrete With Partial Replacement Of Crumb Rubber And M Sand For Fine Aggregates And Flyash For Cement
1 Department of civil engineering, Gokaraju Rangaraju Institute of Engineering & Technology, Hyderabad 5000902, India.
2 Department of civil engineering, Gokaraju Rangaraju Institute of Engineering & Technology, Hyderabad 5000902, India.
3 Department of civil engineering, Gokaraju Rangaraju Institute of Engineering & Technology, Hyderabad 5000902 India.
Concrete has a key role in construction. Study focus on workability of the concrete, Fine Aggregate is partially filled with crumb rubber and M sand, a part of cement is replaced with fly ash. In this investigation the crumb rubber is utilised in place of fine aggregate. The scrap tyre treatment is currently a serious issue against environmental pollution. India stud in forth position in the entire world for rubber tyre market world after china, Europe and the US. Fly ash and M sand is an industrial waste which is included in the concrete. In this investigation workability of concrete is conducted on M20 grade concrete by replacing river side sand with the M sand and crumb rubber at percentage of replacements 0 to 20% at an regular interval of 5%and Compare the results obtained by the modified concrete with the normal concrete.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.