Issue |
E3S Web Conf.
Volume 194, 2020
2020 5th International Conference on Advances in Energy and Environment Research (ICAEER 2020)
|
|
---|---|---|
Article Number | 02009 | |
Number of page(s) | 4 | |
Section | Renewable Energy and New Energy Technology | |
DOI | https://doi.org/10.1051/e3sconf/202019402009 | |
Published online | 15 October 2020 |
Low Temperature Solar-driven Biogas Steam Reforming in a Membrane Reactor
Institute for Development of Energy for African Sustainability (IDEAS), University of South Africa, Private Bag X6, Florida, South Africa, 1710.
* Corresponding author: liux@unisa.ac.za
A prototype for a low temperature solar-driven biogas steam reforming process was designed by coupling a hydrogen selective membrane reactor and linear Fresnel collector technology. To verify the prototype, the membrane reactor model was established by using ASPEN Plus and was studied using a modelled biogas in the temperature range 450 to 500oC. The methane conversion was significantly enhanced by applying the H2 selective membrane. Based on the actual Direct Normal Irradiation in South Africa, the capability of linear Fresnel collector was verified for the required heat duty in this study, which varying from 90.1 to 366.4 kW/m2. This novel work constitutes a reference study for new developments with reactor designs and solar energy application in biogas steam reforming processes.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.