Issue |
E3S Web Conf.
Volume 198, 2020
2020 10th Chinese Geosynthetics Conference & International Symposium on Civil Engineering and Geosynthetics (ISCEG 2020)
|
|
---|---|---|
Article Number | 04006 | |
Number of page(s) | 4 | |
Section | Urban Planning Engineering and Design Application | |
DOI | https://doi.org/10.1051/e3sconf/202019804006 | |
Published online | 26 October 2020 |
A numerical study of flood effect of a bridge at tail of Ganjiang River, entrance of Poyang Lake
Changjiang River Scientific Research Institute, Wuhan, Hubei, 430010, China
* Corresponding author: gh-102@126.com
The construction of a river-crossing bridge will have an impact on the flow movement of the river section, which will bring adverse impact on flood control. In this paper, the influence of a planned bridge project on flood water level and flow field was analysed by using a two-dimensional mathematical model. The calculation results show that the construction of the bridge will cause backwater to the upstream of the bridge, resulting in the elevation of flood water level, thus bringing pressure to the use of flood control dam. At the same time, due to the squeezing effect of bridge piers on the flow, the flow velocity between piers and between piers and embankments on both sides will increase, which will bring adverse effects on the safe operation of the levee and pier.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.