Issue |
E3S Web Conf.
Volume 212, 2020
2020 International Conference on Building Energy Conservation, Thermal Safety and Environmental Pollution Control (ICBTE 2020)
|
|
---|---|---|
Article Number | 02005 | |
Number of page(s) | 6 | |
Section | Construction | |
DOI | https://doi.org/10.1051/e3sconf/202021202005 | |
Published online | 26 November 2020 |
Flexible prefabricated system moravamont 2000
Serbia and European Union, 21000, Ul. Radnička 26, Novi Sad, Sebija
* Corresponding author: dadge_serbia@yahoo.com
At the end of a decade-long research work at the Moravamont plant in Gnjilane, a new completely prefabricated building system was created from reinforced concrete and prestressed precast elements on the track, which was called Moravamont 2000. Presented in paper final results demonstrates that the construction is well and rationally designed, that the construction behaviour for the maximum expected earthquake effects with a return period of 500 years, according to the criterion of regulation, is resistant and resistant to an earthquake without major damage. The idea is to present through new system moravamont 2000 its flexible side along with the possible development using 3D technology.
Key words: prestressed precast element / seismic action / structural system / 3D
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.