Experience in conducting field tests of metal structural constructions of coatings of the “BrSTU”
Brest State Technical University, 224017, Moskovskaya 267, Brest, Belarus
* Corresponding author: nnshalobyta@mail.ru
There are quite often statically complex structures, the reliability of theoretical calculations of which needs experimental verification in the world practice of design and construction. Studies of building structures functioning can be full-scale or carried out on their models in laboratory conditions depending on the goals set. Full-scale tests of building structures are more expensive, therefore, their implementation requires a special approach and justification.
However, to check the operation of complex, critical structures which primarily include metal spatial large-span structures of coatings of buildings and structures especially those used for the first time to assess their bearing capacity, to establish the degree of participation in the construction of each of the elements, to study the operation of individual new nodal elements etc., only full-scale tests are required.
Key words: metal structural constructions / nodal connection / numerical model / stress-strain field tests
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.