Issue |
E3S Web Conf.
Volume 233, 2021
2020 2nd International Academic Exchange Conference on Science and Technology Innovation (IAECST 2020)
|
|
---|---|---|
Article Number | 03045 | |
Number of page(s) | 5 | |
Section | HCCE2020-Hydraulic, Civil and Construction Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202123303045 | |
Published online | 27 January 2021 |
Practices of Hydro-Meteorological Support During Construction Period of Largehydropower Project
Three Gorges Cascade Dispatching Communication Center, CHINA THREE GORGES CORPORATION, China
* Cao hui: cao_hui@ctg.com.cn
The hydrological and meteorological hydro-meteorological support is one important part of the hydropower construction. Accidents caused by flood and rainstorm during construction will be reduced effectively with the help of reliable hydrological and meteorological forecast which also provides critical technical support for flood prevention and construction organization of projects under construction. Based on the practice of the hydro-meteorological support during the construction period of Three Gorges and Jinsha River cascade hydropower station, this article discussed the methods to support and serve hydro meteorology of large-scale cascade hydropower station construction. Meanwhile, this paper also builds up a hydro-meteorology supportive system for hydro-power station under construction which is led by a hydropower development company and associated by local professional institutions. And this research can also be utilized as a reference for other large-scale hydro-power station construction and to support the hydro-meteorology safeguard during the operation period.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.