Issue |
E3S Web Conf.
Volume 236, 2021
3rd International Conference on Energy Resources and Sustainable Development (ICERSD 2020)
|
|
---|---|---|
Article Number | 01029 | |
Number of page(s) | 4 | |
Section | Development, Utilization and Protection of Traditional Energy Resources | |
DOI | https://doi.org/10.1051/e3sconf/202123601029 | |
Published online | 09 February 2021 |
Engineering Practice of Ultra-high Pressure Hydraulic Slotting and Pressure Relief Pumping in Through Layer Hole
1 State Key Laboratory of Gas Disaster Monitoring and Emergency Technology, Chongqing 400037, China
2 China Coal Technology and Engineering Group Chongqing Research Institute, Chongqing 400037, China
a* Corresponding author:siqian_licqmk@163.com
In order to solve the problems of low gas drainage rate and long drainage time in thick coal seam with low permeability, ultra-high pressure hydraulic slotting pressure relief and permeability enhancement technology was applied in the test. The practice shows that after adopting the ultra-high pressure hydraulic slotting, the gas drainage rate is greatly improved, the time for reaching the standard of drainage is shortened, and the difficult problem of gas control in the mining face of thick coal seam is solved, which provides technical guidance for high-efficiency gas control in thick coal seam with similar conditions in mining area.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.