Research on Earthwork Calculation Based on TIN Model
Xi'an University of Science and Technology, 710000, Xi'an City
Corresponding author: Wen Yongxiao, 18295499538@163.com
In actual engineering construction, the calculation of earthwork directly affects the cost budget of the project and the selection of the optimal plan. Therefore, the calculation accuracy and efficiency of the earthwork are very important. This article introduces the construction principle of the TIN model. Based on the TIN model, the earthwork calculation is carried out by the triangular prism method. The data of a fill-excavation balance project in a rugged mountainous area is selected, and under different conditions, the TIN network method and the square grid method are used to calculate the earthwork, and the results are compared and analyzed with accuracy. Estimate. After comparative analysis, it is found that the earthwork calculation using the TIN network method is simple and cheap, and the calculation result is more accurate. It is better than the traditional square grid method as a whole, and can be used in the actual engineering earthwork calculation.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.