Issue |
E3S Web Conf.
Volume 253, 2021
2021 International Conference on Environmental and Engineering Management (EEM 2021)
|
|
---|---|---|
Article Number | 02051 | |
Number of page(s) | 5 | |
Section | Big Data Environment Management Application and Industry Research | |
DOI | https://doi.org/10.1051/e3sconf/202125302051 | |
Published online | 06 May 2021 |
Research on high-speed railway construction and the change of economic gravitation
Beijing Jiaotong University School of Economics and Management Beijing China
The construction of high-speed railway(HSR) can not only improve the quality of transportation infrastructure in China, but also has a significant impact on regional economy. The influence of HSR construction on economic connection intensity in the context of the coordinated development of cities in Beijing-Tianjin-Hebei region is investigated. Based on the improved Gravity Model(GM), the research shows that HSR has a positive effect on the economic gravitation, while the influence of spatial distance on economic connections of cities is negative. According to empirical analysis, it represents an obvious Coreperiphery structure after HSR is opened. It also reveals that the regional economic development is unbalanced, which is caused by the poor transportation infrastructure. In addition, the paper further offers a perspective of how to promote regional economy.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.