Issue |
E3S Web Conf.
Volume 253, 2021
2021 International Conference on Environmental and Engineering Management (EEM 2021)
|
|
---|---|---|
Article Number | 02090 | |
Number of page(s) | 5 | |
Section | Big Data Environment Management Application and Industry Research | |
DOI | https://doi.org/10.1051/e3sconf/202125302090 | |
Published online | 06 May 2021 |
Layout optimization of signal control box production line based on SLP
Qing’an Group Co., Ltd. Xi’an, China
* e-mail: 89505454@qq.com
Taking the production process of the signal control box as the research object, aiming at the problem of the unreasonable layout of the production line, the Systematic Layout Planning (SLP) method is used to obtain the relationship and position relationship diagrams between the various operation units, and the optimal layout plan is given, combined with the factory building Conditions and funding constraints, determined and implemented the production layout improvement plan, reduced the material handling distance, shortened the delivery cycle, and realized the rapid delivery of products.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.