Issue |
E3S Web Conf.
Volume 328, 2021
International Conference on Science and Technology (ICST 2021)
|
|
---|---|---|
Article Number | 05008 | |
Number of page(s) | 5 | |
Section | Material Theory, Modeling & Characterisation, System Manufacture, Dynamic System | |
DOI | https://doi.org/10.1051/e3sconf/202132805008 | |
Published online | 06 December 2021 |
Evaluation of The Facility layout on The Fried Onion Production Process
1 Industrial Department, Engineering Faculty, University of Trunojoyo Madura
2 Industrial Department, Engineering Faculty, University of Muhammadiyah Gresik
* Corresponding author : shofi.fitrotis@trunojoyo.ac.id
Analysis of the design of the facility layout can improve the performance of production lines such as decreasing congestion levels, minimizing material handling costs. PT. XYZ is one of the fried onion companies has constraints on the material handling system that is less efficient because it takes a long time in the process. Therefore, there will be improvements to the layout of PT. XYZ to increase productivity and shorten the time of the production cycle. The method used is From to Chart the method is a conventional technique commonly used for planning factory layouts and moving goods in a production process. From the results obtained that the proposed layout is better than the initial layout with a higher flow efficiency value of 86.18%. The proposed layout utilizes vacant land, so that the production flow does not repeat and does not rotate far, so that the distance between the areas is getting closer.
Key words: Facility layout / Form to chart / Material handling / Backward and Forward analysis
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.