Issue |
E3S Web Conf.
Volume 253, 2021
2021 International Conference on Environmental and Engineering Management (EEM 2021)
|
|
---|---|---|
Article Number | 03008 | |
Number of page(s) | 5 | |
Section | Environmental Equipment Engineering Management and its Technical Application | |
DOI | https://doi.org/10.1051/e3sconf/202125303008 | |
Published online | 06 May 2021 |
Research on modular analysis and evaluation method of ship repair cost
1 Dept. of Management Engineering and Equipment Economics Naval Univ. of Engineering acceptable Wuhan, China
2 College of Mechanical and Electronic Engineering Wuhan Donghu University acceptable Wuhan, China
* Corresponding author: tangyong_tt@163.com
Corresponding author: 18537438@qq.com
Based on the idea of modular design of ship, the ship modular method is used to study the target cost of ship repair, and a modular decomposition and analysis method of ship repair cost is proposed to decompose the ship repair project into relatively independent sub-modules, standardizes the repair scope of sub modules, determines the repair cost standard of sub-modules, and accumulates the repair cost of corresponding sub-modules. At the same time, from the perspective of cost control, cost risks are identified, and the fuzzy analytic hierarchy process is applied to analyze and evaluate risk factors to lay the foundation for cost adjustment and cost reduction risks.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.