Issue |
E3S Web Conf.
Volume 258, 2021
Ural Environmental Science Forum “Sustainable Development of Industrial Region” (UESF-2021)
|
|
---|---|---|
Article Number | 12017 | |
Number of page(s) | 8 | |
Section | Natural Resource Management | |
DOI | https://doi.org/10.1051/e3sconf/202125812017 | |
Published online | 20 May 2021 |
Dual approach to the assessment of the project management system performance and the results of its application in the ITER Project
1 Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
2 JCS EC “ASE”, Dmitrovskoe shosse, 2/1, Moscow, 127434, Russia
3 RAOS Project Ltd, Vyborgskaya nab. 45 E, Saint Petersburg, 194044, Russia
* Corresponding author: morozenkoaa@mgsu.ru
The article considers the current problem of low efficiency of tools and methods used to assess the project management systems of complex engineering facilities. The problem is important today because engineering companies strive to increase their rating in a highly competitive market, and this issue is of a special concern in the international market of goods, works and services. The article presents the methodology for the assessment of the project management system, based on the simultaneous cross-section use of approaches to the assessment of project management and personnel management processes (the so-called “processes – personnel” pair) with the use of questionnaire-dialog forms of data collection. The essence of the study was to search for patterns of cross-assessment results, their comparison and determination of algorithms of mutual influence on each other, and what is necessary for a more accurate assessment of the management system. The scientific novelty of the research is the development of a set of interrelated indicators of the management system behavior in a company. The presented method was tested by the team of authors of this article during the management assessment of the international project on the construction of a thermonuclear reactor (ITER, France) in 2020. The results of the study revealed the comparability of the assessment results, confirmed the impact of the assessment results on each other and determined the possibility of predicting the assessment results per individual indicators, depending on the state of the management system in the “process-personnel” pair. This method can be used to assess the management systems of any project-oriented companies implementing capital construction projects. In the future, it can become the basis for creating a specialized standard for assessing the construction project management systems.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.