Issue |
E3S Web Conf.
Volume 263, 2021
XXIV International Scientific Conference “Construction the Formation of Living Environment” (FORM-2021)
|
|
---|---|---|
Article Number | 04041 | |
Number of page(s) | 7 | |
Section | Engineering and Smart Systems in Construction | |
DOI | https://doi.org/10.1051/e3sconf/202126304041 | |
Published online | 28 May 2021 |
Evaluation of the effectiveness of additional thermal insulation of the basement floor of frame-monolithic buildings in extreme operating conditions
Engineering technical institute, North-Eastern Federal University named after M. K. Ammosov. 677000 Yakutsk, 57, Belinskiy St., Russia.
The issues of saving energy resources are of particular relevance for the regions of Russia with an extremely cold climate. The increased air pressure difference in winter and the presence of volumetric cold bridges in the form of pile and column grillages, basement slabs and concrete block masonry often leads to a violation of the temperature regime of the first floors of multi-storey buildings with a monolithic reinforced concrete frame. Thermal analysis of fragments of basement floors in areas with columns and grillages with additional thermal insulation from the outside was carried out. The low efficiency of the external thermal insulation of the basement elements of the operated frame-monolithic buildings is shown.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.