Issue |
E3S Web Conf.
Volume 264, 2021
International Scientific Conference “Construction Mechanics, Hydraulics and Water Resources Engineering” (CONMECHYDRO - 2021)
|
|
---|---|---|
Article Number | 02068 | |
Number of page(s) | 8 | |
Section | Road Construction, Building Structures and Materials | |
DOI | https://doi.org/10.1051/e3sconf/202126402068 | |
Published online | 02 June 2021 |
Improving the quality of installation of preinsulated pipelines of heat supply systems
1 Kazan State University of Architecture and Engineering, Kazan, Russia
2 Ingstroy, LLC, Kazan, Russia
3 Kazan State Academy of Veterinary Medicine named after N.E. Bauman, Kazan, Russia
* Corresponding author: muhametrahimov@mail.ru
One of the most important directions of Russia's economic and energy strategy is to increase the efficiency in the field of heat supply. One of the options for solving this issue is using preinsulated pipelines, such as steel pipes in polyurethane foam polyethylene insulation. The experience of their application indicates several disadvantages associated with defects in pipes in polyurethane foam insulation and installed pipelines. The studies carried out made it possible to identify the main defects and inconsistencies in the manufacture and installation of preinsulated pipelines and the reasons for their occurrence. Following this, the authors have developed a set of operations and control tools during the installation of pipes in polyurethane foam PE insulation, clarifying the requirements of the input, operational and acceptance types of control, which contribute to improving the quality of the finished product, which was the purpose of this work.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.