Issue |
E3S Web Conf.
Volume 281, 2021
IV International Scientific Conference “Construction and Architecture: Theory and Practice of Innovative Development” (CATPID-2021 Part 1)
|
|
---|---|---|
Article Number | 04001 | |
Number of page(s) | 7 | |
Section | Computational Methods, Mathematical Models and Information Technology in Construction | |
DOI | https://doi.org/10.1051/e3sconf/202128104001 | |
Published online | 02 July 2021 |
Information model for choosing a design solution for providing construction with mortar
The National Research University “Moscow State University of Civil Engineering”, 129337, Moscow, Russia
* Corresponding author: kabanovvn@yandex.ru
Building materials are usually classified according to the criterion of the possibility of creating a stock at the construction site. Mortars and concrete mixtures have a limited time during which they must be used in the construction of building structures. There are technologies for the use of dry components of mortars from which the mixture is prepared at the construction site. However, the technology of manufacturing mortars at specialized plants is widely used, followed by transportation of the finished cement-sand mixture to the construction site. The problem under consideration raises issues related to the volume of supply of mortars and the intensity of this building material consumption. Within the framework of the research, the tasks of analytical description of the construction and installation work intensity influence on the technological processes of cement-sand mortars delivery to the construction site have been solved, a block diagram of the selection of an economically feasible design solution for providing the production process with a building mixture has been developed. On the basis of the presented results in the form of mathematical dependencies and a block diagram, the conclusions about the influence of a design solution for providing construction with a cement-sand mixture on the duration and construction and installation work cost have been formulated. A graphic representation of the procedure for making a decision on the supply of a construction with a cement-sand mixture is supposed to be used for the development of software that provides a description of the construction processes functioning in space and time, including for 3D models.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.