E3S Web Conf.
Volume 281, 2021
IV International Scientific Conference “Construction and Architecture: Theory and Practice of Innovative Development” (CATPID-2021 Part 1)
|
|
---|---|---|
Article Number | 09005 | |
Number of page(s) | 11 | |
Section | Natural and Technospheric Safety. Reliability, Efficiency and Safety of Objects of Fuel and Energy and Construction Complexes | |
DOI | https://doi.org/10.1051/e3sconf/202128109005 | |
Published online | 02 July 2021 |
Environmental safety assessment in the influence zone of the existing Zelenchukskaya HPP-PSHS and Krasnogorsk HPP-1, HPP-2 under construction in the area of Ust-Dzhegutinsky reservoir location
1 Novocherkassk Engineering and Reclamation Institute named after A. K. Kortunov, Donskoy State Agrarian University, 346428, Novocherkassk, Russia
2 WTL (USA ) branch in Asia, Moscow, Russia
3 LLC “Verkhnebalkarskaya MHPP”, 361813, Kabardino-Balkarian Republic, Chereksky district, Vekhnyaya Balkaria village, Russia
* Corresponding author: nimi.TBiP@yandex.ru
«Environmental safety “in the considered spatial limits of the Upper Kuban basin geosystem (F w=11,0*103 km3, W l=3,3*103 km3, Watm=110*103 Wb.g.U.K..=124,3*103 km3) makes up about 21.4% of the spatial limits of the Kuban River, where water resources are formed according to the average long-term data about 3,0 km3, which are used in various sectors of economic activity, including for the electricity generation at Zelenchukskaya HPP-PSHS and Krasnogorsk HPP-1 and HPP-2 under construction with installed power up to 25 mW, located below the HPP-PSHS Zelenchukskaya section and above the alignment (12 km) of the Ust-Dzhegutinsky reservoir. Such HPP-PSHS placement on a 15 km long section of the Kuban Zelenchukskaya riverbed and Krasnogorsk HPP-1 and HPP-2 under construction determined a highly active zone of influence (IV), which is caused by a change in the natural hydrograph of the Kuban River, with the formation of the channel flow movement unsteady hydraulic regime in the considered section of the river to the Ust-Dzhegutinsky reservoir. Unsteady changes in the water level in the Ust-Dzhegutinsky reservoir affects the pressure front structures safety, the functional operation of the water intake system in the Bolshoi Stavropol Canal (BSC) and hydraulic BSC operation. To assess the level of “environmental safety”, it became necessary to develop a mathematical model of the impact of the HPP-PSHS functional work and Krasnogorsk HPP-1 and HPP-2 under construction at the level modes of operation of the Ust-Dzhegutinsky reservoir.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.