Issue |
E3S Web Conf.
Volume 331, 2021
International Conference on Disaster Mitigation and Management (ICDMM 2021)
|
|
---|---|---|
Article Number | 08006 | |
Number of page(s) | 6 | |
Section | Water and Resources Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202133108006 | |
Published online | 13 December 2021 |
Analyses of flood peak discharge in Cimadur river basin, Banten Province, Indonesia
1 Department of Civil Engineering, Faculty of Engineering and Computer Science, Indonesian Technocrat University, Bandar Lampung, Lampung 35132, Indonesia
2 Department of Civil Engineering, Faculty of Engineering, Andalas University, Padang 25164, Indonesia
3 Precision Engineering Division, National Institute for Standards, Giza (12211-136), Egypt
* Corresponding Author: adeliagstna@gmail.com
Cimadur river basin is one of the most important catchment areas in Lebak District, Banten Province. For the past few years, the catchment has experienced floods during the rainy season. The big issue of flooding has been recorded recently in December 2019 which has caused damage and negative impacts to the local people and surrounding community. This study aims to analyze the possibility of flood peak discharges in the catchment area of the Cimadur river. The flood discharges are calculated for 2, 5, 10, 25, 50, and 100 years return period based on the daily rainfall data from the year 2011 to 2020. The rainfall and land use data are obtained from PT Saeba Consultant. In this study, the hydrological analyses are including 1) analyses of average annual rainfall using the Thiessen method; 2) analyses of rainfall distribution and estimation of design rainfall by considering three methods involving: Log-Normal, Log Pearson Type III, and Gumbel Type 1; and 3) analyses of flood discharges by adopting Nakayasu Synthetic Hydrograph Unit (SHU). The rainfall distribution analyses show that the Log Pearson Type III provided the best fit. Based on the flood peak discharges analyses, the results show that the flood discharges for the 5, 10, 25, and 50 years return period in the Cimadur river basin are 470.71 m3/s, 560.16 m3/s, 698 m3/s, and 820.4 m3/s, respectively.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.