Feasibility Analysis of Vacuum Pipeline Magnetic Levitation Energy Storage System Based on Existing Magnetic Levitation Transportation Technology
1 Inner Mongolia Power (Group) Co., Ltd., Inner Mongolia Power Research Institute Branch, Hohhot 010020, China
2 Inner Mongolia Enterprise Key Laboratory of High Voltage and Insulation Technology, Hohhot 010020, China
This paper is mainly summarized the research progress of maglev transportation technology. The vacuum pipeline magnetic levitation energy storage system is constructed based on the existing four types of magnetic levitation as technical prototypes, and the four schemes are formed: as followed: electromagnetic suspension (EMS) medium and low speed magnetic levitation type vacuum pipeline energy storage system, EMS high speed magnetic levitation type vacuum pipeline energy storage system, electric suspension (EDS) high speed magnetic levitation type vacuum pipeline energy storage system and super high-speed rail type vacuum pipeline energy storage system. The energy storage and energy storage cost of these four energy storage systems are analyzed to study their energy storage feasibility.
Key words: Energy storage system / vacuum pipeline / magnetic levitation
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.