Issue |
E3S Web Conf.
Volume 383, 2023
International Scientific Conference Transport Technologies in the 21st Century (TT21C-2023) “Actual Problems of Decarbonization of Transport and Power Engineering: Ways of Their Innovative Solution”
|
|
---|---|---|
Article Number | 02005 | |
Number of page(s) | 9 | |
Section | Environmental Engineering and Geodesy | |
DOI | https://doi.org/10.1051/e3sconf/202338302005 | |
Published online | 24 April 2023 |
The role of agile+bim+tunnel innovation in ensuring economic efficiency and security on backbone infrastructure expansion
Emperor Alexander I Petersburg State Transport University, 9, Moskovsky ave., Saint Petersburg, 190031, Russian Federation
* Corresponding author: ekaterinamost6@gmail.com
This article explores the key lean and safe technologies used for unique transportation projects to expand highway infrastructure. Given today's digital requirements, there are trends to reduce time, cost, and safety, but all of this is possible by introducing several key innovations into the design and construction process. New lean BIM technologies, methods of adaptive flexible Agile-approach have completely transformed modern design technologies and with the application of safe work, methods allow not only to carry out safe reconstruction of transport facilities but also to act as a high-tech locomotive of the transport industry, capable of making a significant contribution of lean production for innovative development of the Eastern polygon. The main task of the reconstruction as a modern intensive ecologically safe production of construction works is necessarily considered with efficient resource consumption and nature management. The authors conclude that the reconstruction of BAM tunnels acts today as the main direction and sets a vector of innovation in the field of investment and innovation projects. Improvement of design activity and presented collective work of specialists of technical and economic specializations of PSUPS of two faculties in the field of tunnel reconstruction should be rightfully named as a prospective resource of economic development in the field of transport construction. The main project technologies under consideration in the innovation aspect: Agile+Bim, economic innovations on the choice of optimal strategy taking into account risk and uncertainty for scenario analysis by Monte-Carlo simulation method, technological innovations using the specialized technological complex for tunnel reconstruction.
Key words: investment and innovation project / innovation security / innovation policy / lean production / agile management / BIM / digital construction / railroads / reconstruction / the method “tunnel in tunnel” / performance indicators / risk assessment / Monte Carlo method
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.