Stabilisation of soil using rice husk ash (RHA) and cement
Department of Civil Engineering, GRIET, Hyderabad, Telangana, India
Most of the soil available for infrastructure development is not suitable for construction. It is a real challenge to overcome the difficulties faced with the problematic soil. We need to get better of difficulties experienced with those soils. In India around The annual output of RHA is 31 million tons..It contains around 85%-90% silica which pollutes the environment and also causes health hazards.As it is producing in large amount every year, there is a need to reduce the environmental pollution with produced Rice Husk Ash(RHA). Generally properties of the RHA are similar to the properties of natural soil, we are making an attempt to mixing soil and Rice Husk Ash to it. As the RHA is a non cementitious material, in experiment has added cement to the soil. In this work, while the cement is kept at a constant amount of soil in percentage, the Rice Husk Ash is taken in various percentages like Five , Ten and fifteen percentages by the amount of the soil. The soil index traced out with soil samples were tested. The objective shows this work is the safe disposal of solid waste (RHA) on one side and increasing the stability of soil which is not suitable for construction to make it suitable.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.