Issue |
E3S Web Conf.
Volume 7, 2016
3rd European Conference on Flood Risk Management (FLOODrisk 2016)
|
|
---|---|---|
Article Number | 13003 | |
Number of page(s) | 10 | |
Section | Non-structural measures and instruments | |
DOI | https://doi.org/10.1051/e3sconf/20160713003 | |
Published online | 20 October 2016 |
Risk reduction by combining nature values with flood protection?
1 Wageningen University and Research centre, Earth System Science Group, P.0. Box 47, 6700 AA Wageningen, the Netherlands
2 Delft University of Technology, P.O. Box 5048, 2600 GA Delft, the Netherlands
a Corresponding author: jantsje.vanloon@wur.nl
In the Netherlands, the concept of a multifunctional dike has already often been implemented, and has been identified as a promising climate adaptation measure. In a multifunctional dike, functions like urban development, transport infrastructure, recreation, agriculture or nature are deliberately combined with its primary flood protection function. This means that the design must be based on the requirements and life span of all different functions, while in a monofunctional dike only the flood protection function is considered. By accommodating other functions, a multifunctional dike may easier fit into, or even contribute to the quality of the landscape. Moreover, these other functions may help in financing the flood protection works, but governance is more complicated. To avoid costly adjustments forthcoming from changed safety standards, incorporation of multiple functions can require a more “robust” flood defence than a monofunctional flood defence. A robust flood defence can withstand more extreme situations than required by the present safety standards, and has a substantially lower flooding probability. Therefore, a multifunctional dike may be attractive in view of the uncertainties regarding the effects of climate change and a changing world. Moreover, it will result in reduced flood risk. As part of the Dutch Delta programme, several explorative studies on multifunctional dikes were initiated. Most studies focused on urban areas, but also in the rural area interest emerged for multifunctional dikes, e.g. for the integration of salt marshes into the flood defences. Marshes provide valuable habitat for vegetation and invertebrate species, and are important for wading birds. Furthermore, under condition of abundant sediment availability they can keep pace with sea level rise. Explorative modelling results indicate that vegetated forelands affect wave heights, even under extreme conditions. However, the inclusion of a vegetated foreland into the dike design does not automatically mean that nature values and flood protection are well integrated. Flood protection imposes rather different requirements on the extent and features of marshes than nature conservation and development. Wave damping is most effective with a high and stable marsh, while nature thrives with dynamic processes and differences in elevation. Therefore, only a design that allows natural marsh dynamics and includes different marsh zones could combine nature values with flood protection. In practice, this means a dike design with an uncertain foreland, that offers space for natural processes. The uncertainty in foreland development reduces the possible flood risk reduction. In our paper we describe the critical points of interest concerning risk reduction in this system.
© The Authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.