The problems of the late implementation of the legal prevention measures for flood risk
Mines-Paristech – PSL Research University – Centre de recherches sur les Risques et les Crises, CS 10907, 06904 Sophia-Antipolis Cedex, France
a Corresponding author: valerie.godfrin@mines-paristech.fr
Three main laws, 13th July 1982, 2nd February 1995 and 30th July 2003, have reformed the French legal framework and introduced special measures to prevent flood risks. Besides, completing these measures, the urban planning law have imposed since the 1987 Law that the urban planning documents have had to take into account the natural hazards to define the buildable areas. But, the late implementation of the prevention provisions and the lack of the urban planning documents concerning the natural hazards have led to a development of the urbanism in the flood prone areas. As consequences, most of the constructions are not flood proof, and many large damages are caused each time a flood occurs. We present this problematic through 8 municipalities in three departments (Aude, Gard, and Var).
© The Authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.