Issue |
E3S Web Conf.
Volume 14, 2017
Energy and Fuels 2016
|
|
---|---|---|
Article Number | 02036 | |
Number of page(s) | 7 | |
Section | Fuels | |
DOI | https://doi.org/10.1051/e3sconf/20171402036 | |
Published online | 15 March 2017 |
The activity of selected gamma radionuclides in the Tatra National Park
AGH University of Science and Technology al. A. Mickiewicza, 30-059 Cracow, Poland
* Corresponding author: bkubica@agh.edu.pl
Cesium is naturally occurring active metal, represented by one stable isotope 133Cs, and number of artificial, unstable, isotopes. The most common artificial isotope of cesium is 137Cs, present in the environment of the Tatra Mountains due to nuclear weapon testing in late `50, and nuclear reactor accident in Chernobyl in 1986. However in recent years the growth in biofuels use for power generation can be the next source of 137Cs emission. Burning wood cultivated on grounds contaminated by 137Cs can introduce secondary emission of this isotope to the atmosphere.This paper presents the results of determination of gamma emitting radionuclides artificial 137Cs and natural 40K in soil samples from the Tatra Mountains. Results show some differences in the vertical distribution of examined radionuclides. It was found that the change of activity of 137Cs in the soil samples depends mostly on the soil density and on the concentration of organic material. The state of “zero” 137Cs activity was developed in the form of maps.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.